REBUILDING THE BEACH
THIS IS THE DREDGE SHIP A FEW HUNDRED YARDS OFF SHORE SUCKING UP SAND AND THEN PUMPING IT THROUGH A STEEL PIPE TO THE BEACH.
THEY USE THE SAND TO REBUILD THE BEACH ADDING A COUPLE OF FEET. THEY ARE REBUILDING THE BEACH DURING THIS SLOW TIME, OCTOBER – MARCH, FROM JUST NORTH OF CLAYTONS DOWN TO FLORENCE.
THERE IS NO SIGN OF THE PURPOSED 3 MILLION DOLLAR PIER THAT’S TO BE BUILT AT CLAYTONS.
0 comments:
Post a Comment